Skip to content

Missions

All missions
UpcomingCrewedMoon

Artemis III

NASA · Launch: 2027 (provisional)

Next crewed Artemis flight after Artemis II, using a commercial lander — first humans near the lunar south pole.

Objective: Return astronauts to the Moon's surface for the first time since 1972.

Crewed launch

Summer 2027

Target date · may change

Mission details

Rocket & spacecraft
SLS rocket + Orion capsule
Lander
SpaceX Starship HLS (Human Landing System)
Crew
4 astronauts — 2 will land on the Moon. Crew not yet officially announced.
Destination
Lunar south pole
Duration
~30 days, about 6.5 days on the surface
  • Orion docks with Starship in lunar orbit; two astronauts ride Starship down to the surface.
  • First crewed landing since Apollo 17 in 1972.
  • Should include the first woman to walk on the Moon.
  • Starship needs several in-orbit refuelling flights before heading to the Moon.

Milestones

1 of 3 reached
  1. Artemis II crewed lunar flyby

    Apr 2026

  2. Lander demonstrations

    2026–2027Provisional

  3. Crewed launch

    2027Provisional

Future dates are agency targets, not confirmed schedules.